Client: Abu Dhabi Transmission and Despatch Company (Transco)
Consultant: Lahmeyer International
Main EPC Contractor: Siemens LLC
Construction time: 12 months.
Built-up area: over 10,000m2.
Description: The global power house Siemens awarded Commodore Contracting for the civil works of their turnkey substation with 400-kV gas-insulated switchgear (GIS), 132-kV switchgear, 33-kV switchgear, and 500MVA and 120MVA power transformers. The grid station on a plot 250m x 150m comprise 5 buildings: 2 Switchgear buildings, 1 Control Building, 2 auxiliary main buildings and the transformer compounds for 500MVA and 120MVA transformers.