We built a big variety of electrical substations for multiple owners ranging from 33kV, 132kV, 220kV to 400kV. Commodore’s scope is mainly the turnkey civil part of the project. A typical substation consist of multiple buildings for switchgear, transformers and controls and comprise roads and infrastructure. Construction time required is 10-12 months and must be ready for equipment (RFE) as soon as the electrical equipment arrives.