contact us home

Projects - Villa Compound Khalifa City A


khalifa-villa

Client: H.H. Sheikh Tahnoun Bin Saeed Bin Shakhbout Al Nahyan
Consultant: World Planners Consultant Engineers L.L.C.
Construction time: 12 months.
Description: Developed as a residential villas compound in Abu Dhabi, the project comprises 54 villas with three or four bed rooms. Each building consist of ground floor plus first floor plus roof floor with a built-up area of 635m2 plus terrace area. As contract time was 12 months only major parts of the buildings was premanufactured off site and assembled on site only. Walls are constructed upon light gauge steel (LGS) structures which provide an even improved thermal insulation and sound control compared to conventional building techniques and advantages mechanical and electrical installations.

[Back to Projects]

khalifa-villa-inner001